Wrapped and Ready for Delivery

10 December 2025

While Santa’s elves are busy prepping in the North Pole for their annual delivery marathon, ours are hard at work across our M&A facilities in Banbridge, Dundalk, Gilford, Mallusk, and Scarva.

As the North Pole focuses on toys, our workshops craft something a little bigger. At Mallusk, offsite riser and lateral modules, along with plantroom skids, are being built for a new custodial facility in Scotland, designed to run entirely on renewable energy—including ground source and water source heat pumps—to support the Scottish Government’s low carbon targets.

There may not be toys, but there’s plenty of coordinated pipework, insulation, and precision assembly. Each module is built, aligned, and QA-tested before leaving our facilities, ensuring quality, safety, and a smooth installation on site.

Mrs Claus even dropped by to check on the latest plantroom skid assemblies at Mallusk. She’s delighted to report that the modules are now carefully wrapped, just the way Santa likes, and prepared for delivery.

More festive magic to come — the elves aren’t done yet.

Share this story, choose your platform: