1.2 MW Gas LTHW Plantroomweek reduction in onsite programme
reduction in site traffic & disruption
“Really pleased with the cooperation of Alternative Heat, and the finished project on site.”
Location:
Pingle, Derbyshire
Project Value:
£400,000
Sector:
Education
Project Status:
Complete
Scope
1.2MW Gas LTHW Packaged Plantroom
Project Overview
Alternative Heat secured the contract to deliver a replacement LTHW plantroom at Pingle Academy, Derbyshire. This comprehensive project included the design, fabrication and installation of a new prefabricated plantroom, the safe removal of the pre-existing coal fired boiler room and all associated on-site civils.
Full in-house control over design, prefabrication and civils works enabled a short construction programme to be maintained, with all works undertaken and completed within an 8-week period, minimising disruption and H&S concerns on this live school site.
The plantroom comprised of 2No. 3 x 9m modules to include 4No. 290kW gas boilers, BMS controls, a 1,200kW PHE and new district pump sets, connecting to the school distribution system via new prefabricated district pipework.