Fleming Park 2MW - Gas CHP

2MW
Gas CHP

Client: Borough Council

Location: Eastleigh, South Hampshire

Date of Installation: March 2017

Contract Value: £625,000


System Overview


Eastleigh Borough Council are building a new state of the art recreational facility. the new facilities will include 15 badminton court sports hall and gym, an eight lane 25m swimming pool and changing village, three multipurpose studios and a group spinning studio. The new centre will also be family friendly, with a creche and a large soft play are incorporating party rooms.

We were employed by Eastleigh Borough Council as the specialist CHP contractor. We designed, pre-fabricated, installed and commissioned the new CHP system that is connected to the existing district heating systems, which was amended by their approved contractor to connect the new Leisure Centre. Our innovative Energy Centre incorporated 1No. Bosch CE240 CHP Unit with 4No. Hoval 575kW Ultra Gas condensing boilers installed within 2No. combined modular units. The 2No. units were connected on site to form 1No. complete Energy Centre. The modular energy centre design simplified delivery and aided in a faster installation on site to bring the complete unit to a commissioning/ handover stage with less time involved.